Company Logo

Jersey

Systems Interface completed ILS installation at Jersey Airport

05 Oct 2023
#73247

Systems Interface has successfully completed a turnkey contract for the design, supply, installation and commissioning of a replacement Instrument Landing System (ILS) with Distance Measuring Equipment (DME) on Runway 26 at Jersey Airport for Ports of Jersey.

Systems Interface provided a complete project management service throughout the contract including, an onsite two-week manufacturer’s training course. The new system entered operational service on time ahead of the busy summer schedule.

Systems interface installed a Normarc 7000 series ILS consisting of a two Frequency Dual Transmitter Localizer (LOC) with a 12-element two frequency LOC Antenna system; a two-frequency dual transmitter Glide Path (GP) system and M-array GP antenna system, including monitor mast and a Normarc low Power 100W DME including antenna.

The ILS system has full Remote Control and Monitoring and Remote Maintenance and Monitoring Systems.

Exception '' occured!
Message:
StackTrace:
Login

I forgot my password

Questions? info@airport-information.com

Password recovery

Please enter your email and we will send you your password

Trial version

You are currently using the Albatross database in TRIAL mode.
Only a part of all available data is visible!

If you are already a subscriber: Please log-in !

Interested in a full version access ? Contact us!

Please wait